PRODUCTS
- Woodworking machinery
- Plywood & Boards
- Veneer & Melamine Paper
- Construction materials
CONTACT US
Linyi Haoxing Economic And Trade Co., Ltd.
Tel: 0086 13153953591
Phone:86 0539 8130798
Fax:86 0539 8130559
Email:haoxinggroup@163.com
Sales manager: Cindy Meng


Veneer Peeling Machine
Veneer peeling machine
Min.Order Quantity: 1set
Port of Loading: Qingdao,China
Payment Terms: T/T , L/C at sight.etc
Main Market: South-east Asia(Philippines,Malaysia,Indonesia,Vietnam),etc
Product Description
Product Specifications:
Machine type | WK-700 | WK-500 | WK-400 |
Machine length | 3700mm | 3500mm | 3200mm |
Machine width | 2400mm | 2200mm | 1600mm |
Machine height | 1600mm | 1500mm | 1500mm |
Machine weight | 4.5t | 3.5t | 2t |
Peeling speed | 18-20mm/min | 36-38m/min | 31-33m/min |
Peeling thickness | 3mm-8mm | 0.3mm-3mm | 0.5mm-3.6mm |
Peeling length | 970-1270mm | 970-1270mm | 970-1270mm |
Cutting width | 500-3000mm | 500-3000mm | / |
Machine power | 30kw | 22kw | 13.5kw |
Peeling diameter | 700mm | 500mm | |
Core diameter of remaining | 80mm | 30-26mm | 26mm |
Rollers diameter | 98mm (or 110mm) |
Notice:
1) The type of veneer peeling machine include both peeling and cutting two features;
2) This machine is mainly used for peeling wood species such as poplar and eucalyptus;
3)There are 3 set of rollers (9 rollers in total) in this peeling machine,different roller diameter depending on the hardness of the log, the large hardness using larger diameter rollers.
For Veneer Production Line,other related machines:
Log Debarker | Log Feeding Machine | Automatic Veneer Conveyor | Veneer Dryer Machine
FAQ:
1)Delivery time : normally 40-50 days, production line need around 70-90 days according to the order.
2)Machine guarantee: The guarantee period is 12 months after installation.
3) After sales services: 1. we have professional engineer team to work at customer's factory to guide installation and debugging and free training workers.
4)machine is lifetime warranty, if beyond the guarantee period, we will charge the spare parts charges and worker salary.